ITAC Assessment: MZ0175
ITAC logo
ITAC Assessment: MZ0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Vehicle frames and body works
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 105,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,004 2,329,026
kWh
Electricity Demand $17,760 6,528
kW-mo/yr
Natural Gas $18,822 1,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,062 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,580 $25,425 $2,949
86,985
kWh
$631
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,344 $1,800 $1,344
39,639
kWh
- -
03 2.7135: Install occupancy sensors $953 $1,500 $953
28,144
kWh
- -
04 2.7442: Keep doors and windows shut when not on use $1,198 - - - $1,198
-
MMBtu
05 2.2511: Insulate bare equipment $3,987 $14,400 - - $3,987
-
MMBtu
TOTAL RECOMMENDED $11,062 $43,125 $5,246
154,768
kWh
$631
-
kW-mo/yr
$5,185
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs