ITAC Assessment: MZ0158
ITAC logo
ITAC Assessment: MZ0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Fiberglass and Vinyl Windows and Doors
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 56
Plant Area 750,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $825,127 19,897,469
kWh
Electricity Demand $701,310 47,956
kW-mo/yr
Electricity Fees $(-25,740.0) -
Natural Gas $172,576 26,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $24,805 $8,100 - - $24,805
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $11,949 $2,100 $8,060
194,220
kWh
$3,889
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,912 $5,470 $6,681
160,981
kWh
$3,231
-
kW-mo/yr
- -
04 2.7241: Install outside air damper / economizer on hvac unit $6,802 $13,500 $3,089
74,422
kWh
$3,713
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,484 $1,525 $4,166
100,377
kWh
$2,018
-
kW-mo/yr
- $(-700.0)
TOTAL RECOMMENDED $58,952 $30,695 $21,996
530,000
kWh
$12,851
-
kW-mo/yr
$24,805
-
MMBtu
$(-700.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs