| Assessment Year | 2014 |
|---|---|
| Principal Product | Fiberglass and Vinyl Windows and Doors |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 56 |
| Plant Area |
750,000
ft2
|
| Annual Production | 60,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $825,127 | 19,897,469 |
kWh
|
$0.041 |
| Electricity Demand | $701,310 | 47,956 |
kW-mo/yr
|
$14.62 |
| Electricity Fees | $(-25,740.0) | - |
|
- |
| Natural Gas | $172,576 | 26,060 |
MMBtu
|
$6.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $58,952 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $24,805 | $8,100 | - | - |
$24,805
-
MMBtu
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $11,949 | $2,100 |
$8,060
194,220
kWh
|
$3,889
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,912 | $5,470 |
$6,681
160,981
kWh
|
$3,231
-
kW-mo/yr
|
- | - | |
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $6,802 | $13,500 |
$3,089
74,422
kWh
|
$3,713
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,484 | $1,525 |
$4,166
100,377
kWh
|
$2,018
-
kW-mo/yr
|
- | $(-700.0) | |
| TOTAL RECOMMENDED | $58,952 | $30,695 |
$21,996
530,000
kWh
|
$12,851
-
kW-mo/yr
|
$24,805
-
MMBtu
|
$(-700.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs