| Assessment Year | 1991 |
|---|---|
| Principal Product | WIRE, BASKETS, SHELVING |
| NAICS |
n/a
|
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $50 M to 100M |
| # of Employees | 430 |
| Plant Area |
n/a
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $447,192 | 7,072,099 |
kWh
|
$0.063 |
| Natural Gas | $264,603 | 69,386 |
MMBtu
|
$3.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $89,904 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $89,904 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $27,648 | $34,850 |
$27,648
-
kWh
|
- | |
| 02 | 2.3511: Use plant owned transformers or lease transformers | $18,637 | $34,000 |
$18,637
-
kWh
|
- | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,117 | - |
$3,117
-
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,964 | - |
$13,964
221,278
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,775 | $21,477 |
$8,775
139,215
kWh
|
- | |
| 06 | 2.7123: Keep lamps and reflectors clean | $6,364 | - |
$6,364
101,700
kWh
|
- | |
| 07 | 2.4133: Use most efficient type of electric motors | $2,089 | $1,892 |
$2,089
33,118
kWh
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,841 | $3,067 |
$2,841
45,135
kWh
|
- | |
| 09 | 2.7233: Use properly designed and sized hvac equipment | $756 | $880 |
$756
12,016
kWh
|
- | |
| 10 | 2.2414: Use waste heat from hot flue gases to preheat | $5,713 | $20,700 | - |
$5,713
-
MMBtu
|
|
| TOTAL RECOMMENDED | $89,904 | $116,866 |
$84,191
552,462
kWh
|
$5,713
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $89,904 | $116,866 |
$84,191
552,462
kWh
|
$5,713
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs