| Assessment Year | 2014 |
|---|---|
| Principal Product | Al Die Castings |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $50 M to 100M |
| # of Employees | 280 |
| Plant Area |
140,000
ft2
|
| Annual Production | 35,000,000
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,843,344 | 36,144,000 |
kWh
|
$0.051 |
| Electricity Demand | $623,460 | 83,128 |
kW-mo/yr
|
$7.50 |
| Natural Gas | $130,151 | 23,826 |
MMBtu
|
$5.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $70,579 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,928 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,003 | $9,000 |
$4,120
82,404
kWh
|
$883
-
kW-mo/yr
|
- | |
| 02 | 2.7132: Install timers on light switches in little used areas | $833 | $690 |
$833
16,654
kWh
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $14,092 | $1,160 |
$11,605
232,099
kWh
|
$2,487
-
kW-mo/yr
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $1,587 | $1,600 | - | - |
$1,587
-
MMBtu
|
|
| 05 | 2.2511: Insulate bare equipment | $9,287 | $9,958 | - | - |
$9,287
-
MMBtu
|
|
| 06 | 2.4239: Eliminate or reduce compressed air usage | $39,777 | $37,700 |
$5,192
103,843
kWh
|
$34,585
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $70,579 | $60,108 |
$21,750
435,000
kWh
|
$37,955
-
kW-mo/yr
|
$10,874
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $19,928 | $10,850 |
$16,558
331,157
kWh
|
$3,370
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs