| Assessment Year | 2014 |
|---|---|
| Principal Product | plating |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $5 M to 10M |
| # of Employees | 11 |
| Plant Area |
29,000
ft2
|
| Annual Production | 1,400
thousand feet
|
| Production Hrs. Annual | 2,625
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,294 | 496,506 |
kWh
|
$0.12 |
| Electricity Demand | $27,265 | 4,656 |
kW-mo/yr
|
$5.86 |
| Natural Gas | $22,696 | 2,686 |
MMBtu
|
$8.45 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,924 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,947 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7134: Use photocell controls | $1,021 | $980 |
$1,021
8,554
kWh
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $549 | $850 |
$448
3,755
kWh
|
$101
-
kW-mo/yr
|
- | |
| 03 | 2.2511: Insulate bare equipment | $1,630 | $897 | - | - |
$1,630
-
MMBtu
|
|
| 04 | 2.2511: Insulate bare equipment | $546 | $2,000 | - | - |
$546
-
MMBtu
|
|
| 05 | 2.2511: Insulate bare equipment | $2,225 | $4,000 | - | - |
$2,225
-
MMBtu
|
|
| 06 | 2.4131: Size electric motors for peak operating efficiency | $1,573 | $1,700 |
$1,285
10,763
kWh
|
$288
-
kW-mo/yr
|
- | |
| 07 | 2.4133: Use most efficient type of electric motors | $380 | $1,000 |
$380
3,184
kWh
|
- | - | |
| TOTAL RECOMMENDED | $7,924 | $11,427 |
$3,134
26,256
kWh
|
$389
-
kW-mo/yr
|
$4,401
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,947 | $3,980 |
$1,401
11,738
kWh
|
- |
$546
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs