ITAC Assessment: MZ0148
ITAC logo
ITAC Assessment: MZ0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 11
Plant Area 29,000
ft2
Annual Production 1,400
thousand feet
Production Hrs. Annual 2,625
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,294 496,506
kWh
Electricity Demand $27,265 4,656
kW-mo/yr
Natural Gas $22,696 2,686
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7134: Use photocell controls $1,021 $980 $1,021
8,554
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $549 $850 $448
3,755
kWh
$101
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $1,630 $897 - - $1,630
-
MMBtu
04 2.2511: Insulate bare equipment $546 $2,000 - - $546
-
MMBtu
05 2.2511: Insulate bare equipment $2,225 $4,000 - - $2,225
-
MMBtu
06 2.4131: Size electric motors for peak operating efficiency $1,573 $1,700 $1,285
10,763
kWh
$288
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $380 $1,000 $380
3,184
kWh
- -
TOTAL RECOMMENDED $7,924 $11,427 $3,134
26,256
kWh
$389
-
kW-mo/yr
$4,401
-
MMBtu
TOTAL IMPLEMENTED $1,947 $3,980 $1,401
11,738
kWh
- $546
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs