ITAC Assessment: MZ0146
ITAC logo
ITAC Assessment: MZ0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product bio-materials, chemicals
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 138,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 3,090
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $616,922 9,450,206
kWh
Electricity Demand $44,788 16,488
kW-mo/yr
Natural Gas $184,585 37,440
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $14,453 - $6,337
97,041
kWh
$226
-
kW-mo/yr
$7,890
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $34,621 - $19,143
293,155
kWh
$682
-
kW-mo/yr
$14,796
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,588 $2,500 $1,368
20,946
kWh
$220
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $7,790 $4,375 $7,790
119,294
kWh
- -
05 2.7135: Install occupancy sensors $12,828 $3,375 $12,828
196,446
kWh
- -
TOTAL RECOMMENDED $71,280 $10,250 $47,466
726,882
kWh
$1,128
-
kW-mo/yr
$22,686
-
MMBtu
TOTAL IMPLEMENTED $50,662 $2,500 $26,848
411,142
kWh
$1,128
-
kW-mo/yr
$22,686
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs