Assessment Year | 2017 |
---|---|
Principal Product | Retail store metal products |
NAICS | 337215: Showcase, Partition, Shelving, and Locker Manufacturing |
SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
128,700
ft2
|
Annual Production | 80,001
units
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,600 | 569,775 |
kWh
|
$0.087 |
Electricity Demand | $60,803 | 3,203 |
kW-mo/yr
|
$18.98 |
Electricity Fees | $13,672 | - |
|
- |
Natural Gas | $4,857 | 524 |
MMBtu
|
$9.26 |
TOTAL YEARLY COSTS | $128,932 | |||
RECOMMENDED SAVINGS* | $27,283 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,283 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,392 | $25,659 |
$5,533
63,520
kWh
|
$5,859
-
kW-mo/yr
|
|
02 | 2.7134: Use photocell controls | $8,753 | $17,253 |
$7,552
86,703
kWh
|
$1,201
-
kW-mo/yr
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,431 | $6,068 |
$4,431
50,871
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,299 | $2,500 |
$1,299
14,916
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $989 | $400 |
$989
11,351
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $419 | $1,000 |
$419
4,809
kWh
|
- | |
TOTAL RECOMMENDED | $27,283 | $52,880 |
$20,223
232,170
kWh
|
$7,060
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $27,283 | $52,880 |
$20,223
232,170
kWh
|
$7,060
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs