Assessment Year | 2013 |
---|---|
Principal Product | Plastic Injection Molding |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 155 |
Plant Area |
321,607
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,112,057 | 27,892,064 |
kWh
|
$0.040 |
Electricity Demand | $787,459 | 62,972 |
kW-mo/yr
|
$12.50 |
Electricity Fees | $38,530 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $290,048 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $249,561 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $109,110 | $85,800 |
$75,835
1,900,110
kWh
|
$33,275
-
kW-mo/yr
|
- | - | |
02 | 2.8112: Combine utility meters | $40,487 | $25,000 | - |
$40,487
-
kW-mo/yr
|
- | - | |
03 | 2.3212: Optimize plant power factor | $34,640 | $92,500 | - | - | $34,640 | - | |
04 | 2.2511: Insulate bare equipment | $25,086 | $2,277 |
$17,436
436,990
kWh
|
$7,650
-
kW-mo/yr
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,736 | $26,800 |
$8,161
204,530
kWh
|
$3,575
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,288 | $24,000 |
$2,984
74,768
kWh
|
$1,304
-
kW-mo/yr
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $3,432 | $50 |
$2,382
59,706
kWh
|
$1,050
-
kW-mo/yr
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,740 | $1,325 |
$2,040
51,134
kWh
|
$900
-
kW-mo/yr
|
- | $(-200.0) | |
09 | 2.4221: Install compressor air intakes in coolest locations | $2,335 | $490 |
$1,622
40,651
kWh
|
$713
-
kW-mo/yr
|
- | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $915 | $1,050 |
$636
15,931
kWh
|
$279
-
kW-mo/yr
|
- | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $55,279 | $350,000 |
$38,421
962,928
kWh
|
$16,858
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $290,048 | $609,292 |
$149,517
3,746,748
kWh
|
$106,091
-
kW-mo/yr
|
$34,640 | $(-200.0) | ||
TOTAL IMPLEMENTED | $249,561 | $584,292 |
$149,517
3,746,748
kWh
|
$65,604
-
kW-mo/yr
|
$34,640 | $(-200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs