Assessment Year | 1996 |
---|---|
Principal Product | Coated Abrasives |
NAICS |
n/a
|
SIC | 3291: Abrasive Products |
Sales Range | $10 M to 50M |
# of Employees | 76 |
Plant Area |
45,400
ft2
|
Annual Production | 13,500,000
thousand feet
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $37,174 | 696,659 |
kWh
|
$0.053 |
Electricity Demand | $15,583 | 3,322 |
kW-mo/yr
|
$4.69 |
Electricity Fees | $5,553 | - |
|
- |
Natural Gas | $27,899 | 5,738 |
MMBtu
|
$4.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $76,319 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,529 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $916 | $2,250 | - | - |
$916
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,249 | $1,495 | - | - |
$2,249
-
MMBtu
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $228 | $500 |
$174
3,224
kWh
|
$54
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,052 | $7,879 |
$2,035
38,101
kWh
|
$1,017
-
kW-mo/yr
|
- | - | |
05 | 3.1191: Change procedures / equipment / operating conditions | $69,874 | $40,000 | - | - | - |
$69,874
-
lb
|
|
TOTAL RECOMMENDED | $76,319 | $52,124 |
$2,209
41,325
kWh
|
$1,071
-
kW-mo/yr
|
$3,165
-
MMBtu
|
$69,874
-
lb
|
||
TOTAL IMPLEMENTED | $5,529 | $9,874 |
$2,209
41,325
kWh
|
$1,071
-
kW-mo/yr
|
$2,249
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs