ITAC Assessment: OD0071
ITAC logo
ITAC Assessment: OD0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Coated Abrasives
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 76
Plant Area 45,400
ft2
Annual Production 13,500,000
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,174 696,659
kWh
Electricity Demand $15,583 3,322
kW-mo/yr
Electricity Fees $5,553 -
Natural Gas $27,899 5,738
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,529

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2414: Use waste heat from hot flue gases to preheat $916 $2,250 - - $916
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,249 $1,495 - - $2,249
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $228 $500 $174
3,224
kWh
$54
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,052 $7,879 $2,035
38,101
kWh
$1,017
-
kW-mo/yr
- -
05 3.1191: Change procedures / equipment / operating conditions $69,874 $40,000 - - - $69,874
-
lb
TOTAL RECOMMENDED $76,319 $52,124 $2,209
41,325
kWh
$1,071
-
kW-mo/yr
$3,165
-
MMBtu
$69,874
-
lb
TOTAL IMPLEMENTED $5,529 $9,874 $2,209
41,325
kWh
$1,071
-
kW-mo/yr
$2,249
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs