ITAC Assessment: MZ0128
ITAC logo
ITAC Assessment: MZ0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Truck Tank Trailer
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 146,000
ft2
Annual Production 963
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $205,587 3,033,200
kWh
Natural Gas $35,122 5,818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,032 $90,880 $22,032
324,000
kWh
-
02 2.7144: Install spectral reflectors / delamp $1,584 - $1,584
23,296
kWh
-
03 2.7496: Install partitions to reduce size of conditioned space $1,679 - $1,679
24,693
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,270 $400 $1,270
18,680
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,891 $1,160 $1,891
27,803
kWh
-
06 2.6127: Maintain air filters by cleaning or replacement $1,045 $150 $1,045
15,373
kWh
-
07 2.7135: Install occupancy sensors $218 $190 $218
3,200
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $418 $1,000 $418
6,336
kWh
-
09 2.2442: Preheat combustion air with waste heat $717 $2,000 - $717
-
MMBtu
TOTAL RECOMMENDED $30,854 $95,780 $30,137
443,381
kWh
$717
-
MMBtu
TOTAL IMPLEMENTED $29,175 $95,780 $28,458
418,688
kWh
$717
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs