Assessment Year | 2013 |
---|---|
Principal Product | Truck Tank Trailer |
NAICS | 336212: Truck Trailer Manufacturing |
SIC | 3715: Truck Trailers |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
146,000
ft2
|
Annual Production | 963
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $205,587 | 3,033,200 |
kWh
|
$0.068 |
Natural Gas | $35,122 | 5,818 |
MMBtu
|
$6.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,854 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,175 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,032 | $90,880 |
$22,032
324,000
kWh
|
- | |
02 | 2.7144: Install spectral reflectors / delamp | $1,584 | - |
$1,584
23,296
kWh
|
- | |
03 | 2.7496: Install partitions to reduce size of conditioned space | $1,679 | - |
$1,679
24,693
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,270 | $400 |
$1,270
18,680
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,891 | $1,160 |
$1,891
27,803
kWh
|
- | |
06 | 2.6127: Maintain air filters by cleaning or replacement | $1,045 | $150 |
$1,045
15,373
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $218 | $190 |
$218
3,200
kWh
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $418 | $1,000 |
$418
6,336
kWh
|
- | |
09 | 2.2442: Preheat combustion air with waste heat | $717 | $2,000 | - |
$717
-
MMBtu
|
|
TOTAL RECOMMENDED | $30,854 | $95,780 |
$30,137
443,381
kWh
|
$717
-
MMBtu
|
||
TOTAL IMPLEMENTED | $29,175 | $95,780 |
$28,458
418,688
kWh
|
$717
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs