Assessment Year | 2013 |
---|---|
Principal Product | Extruded Tubing and Rubber |
NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
60,000
ft2
|
Annual Production | 3,825,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $187,201 | 2,638,507 |
kWh
|
$0.071 |
Electricity Demand | $21,680 | 8,235 |
kW-mo/yr
|
$2.63 |
Electricity Fees | $2,337 | - |
|
- |
Natural Gas | $10,075 | 1,155 |
MMBtu
|
$8.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,585 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,473 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,938 | - |
$4,938
69,650
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $4,161 | $4,018 |
$4,161
58,693
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,978 | $1,256 |
$2,978
41,998
kWh
|
- | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,074 | $10,000 |
$2,074
29,250
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $2,196 | $3,512 |
$2,043
28,815
kWh
|
$153
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,354 | $1,090 |
$1,502
21,181
kWh
|
$108
-
kW-mo/yr
|
$(-256.0) | |
07 | 2.4221: Install compressor air intakes in coolest locations | $423 | $360 |
$397
5,604
kWh
|
$26
-
kW-mo/yr
|
- | |
08 | 2.4239: Eliminate or reduce compressed air usage | $342 | $200 |
$318
4,480
kWh
|
$24
-
kW-mo/yr
|
- | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $119 | $32 |
$111
1,561
kWh
|
$8
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $18,585 | $20,468 |
$18,522
261,232
kWh
|
$319
-
kW-mo/yr
|
$(-256.0) | ||
TOTAL IMPLEMENTED | $1,473 | $1,122 |
$1,613
22,742
kWh
|
$116
-
kW-mo/yr
|
$(-256.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs