Assessment Year | 2012 |
---|---|
Principal Product | industrial batteries |
NAICS | 335911: Storage Battery Manufacturing |
SIC | 3691: Storage Batteries |
Sales Range | $50 M to 100M |
# of Employees | 485 |
Plant Area |
512,000
ft2
|
Annual Production | 75,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,722,038 | 50,755,282 |
kWh
|
$0.054 |
Electricity Demand | $466,560 | 78,459 |
kW-mo/yr
|
$5.95 |
Natural Gas | $463,405 | 176,721 |
MMBtu
|
$2.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $312,566 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,851 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $55,068 | $26,420 |
$47,982
896,866
kWh
|
$7,086
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,548 | $31,400 |
$24,003
448,652
kWh
|
$3,545
-
kW-mo/yr
|
|
03 | 2.7135: Install occupancy sensors | $5,174 | $1,750 |
$5,174
96,710
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $87,874 | $6,500 |
$87,874
1,642,500
kWh
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $20,969 | $3,000 |
$20,969
391,940
kWh
|
- | |
06 | 2.7496: Install partitions to reduce size of conditioned space | $7,267 | $25,000 |
$7,267
136,341
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,893 | $850 |
$1,643
30,712
kWh
|
$250
-
kW-mo/yr
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $18,537 | $1,200 |
$16,152
301,900
kWh
|
$2,385
-
kW-mo/yr
|
|
09 | 2.7135: Install occupancy sensors | $88,236 | $30,000 |
$88,236
1,649,253
kWh
|
- | |
TOTAL RECOMMENDED | $312,566 | $126,120 |
$299,300
5,594,874
kWh
|
$13,266
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $62,851 | $62,000 |
$59,056
1,104,355
kWh
|
$3,795
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs