ITAC Assessment: SF0305
ITAC logo
ITAC Assessment: SF0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product tomato sauce
NAICS 311421: Fruit and Vegetable Canning
SIC 2003:
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 896,465
ft2
Annual Production 400,000
ton
Production Hrs. Annual 3,616
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,096,481 10,353,000
kWh
Natural Gas $1,000,000 773,033
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $308,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,253

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,253 $924 $3,253
49,321
kWh
- - - - -
02 2.2414: Use waste heat from hot flue gases to preheat $46,562 $7,250 - - $46,562
-
MMBtu
- - -
03 2.2136: Install / repair insulation on steam lines $7,245 $4,237 - - $7,245
-
MMBtu
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $127,648 $99,552 $31,432
371,100
kWh
$4,968
-
kW-mo/yr
$91,248
-
MMBtu
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,088 $22,853 $11,658
108,947
kWh
$2,430
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $1,408 $2,520 $1,039
7,914
kWh
$369
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,215 $6,387 $2,580
22,257
kWh
$635
-
kW-mo/yr
- - - -
08 2.7111: Reduce illumination to minimum necessary levels $5,345 $13,619 $4,260
36,327
kWh
$1,085
-
kW-mo/yr
- - - -
09 2.4133: Use most efficient type of electric motors $11,916 $18,347 $5,958
56,941
kWh
$5,958
-
kW-mo/yr
- - - -
10 2.8114: Change rate schedules or other changes in utility service $35,920 $138,400 - - - - - $35,920
11 3.5313: Increase amount of waste recovered for resale $29,001 - - - - - $29,001
-
lb
-
12 3.5315: Lease / purchase baler; sell cardboard to recycler $5,421 $385 - - - - $5,421
-
lb
-
13 3.4115: Recover and reuse cooling water $17,440 $8,393 - - - $17,440
-
Tgal
- -
TOTAL RECOMMENDED $308,462 $322,867 $60,180
652,807
kWh
$15,445
-
kW-mo/yr
$145,055
-
MMBtu
$17,440
-
Tgal
$34,422
-
lb
$35,920
TOTAL IMPLEMENTED $3,253 $924 $3,253
49,321
kWh
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs