Assessment Year | 2005 |
---|---|
Principal Product | tomato sauce |
NAICS | 311421: Fruit and Vegetable Canning |
SIC | 2003: |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
896,465
ft2
|
Annual Production | 400,000
ton
|
Production Hrs. Annual | 3,616
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,096,481 | 10,353,000 |
kWh
|
$0.11 |
Natural Gas | $1,000,000 | 773,033 |
MMBtu
|
$1.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $308,462 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,253 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,253 | $924 |
$3,253
49,321
kWh
|
- | - | - | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $46,562 | $7,250 | - | - |
$46,562
-
MMBtu
|
- | - | - | |
03 | 2.2136: Install / repair insulation on steam lines | $7,245 | $4,237 | - | - |
$7,245
-
MMBtu
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $127,648 | $99,552 |
$31,432
371,100
kWh
|
$4,968
-
kW-mo/yr
|
$91,248
-
MMBtu
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,088 | $22,853 |
$11,658
108,947
kWh
|
$2,430
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7135: Install occupancy sensors | $1,408 | $2,520 |
$1,039
7,914
kWh
|
$369
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,215 | $6,387 |
$2,580
22,257
kWh
|
$635
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $5,345 | $13,619 |
$4,260
36,327
kWh
|
$1,085
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4133: Use most efficient type of electric motors | $11,916 | $18,347 |
$5,958
56,941
kWh
|
$5,958
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.8114: Change rate schedules or other changes in utility service | $35,920 | $138,400 | - | - | - | - | - | $35,920 | |
11 | 3.5313: Increase amount of waste recovered for resale | $29,001 | - | - | - | - | - |
$29,001
-
lb
|
- | |
12 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $5,421 | $385 | - | - | - | - |
$5,421
-
lb
|
- | |
13 | 3.4115: Recover and reuse cooling water | $17,440 | $8,393 | - | - | - |
$17,440
-
Tgal
|
- | - | |
TOTAL RECOMMENDED | $308,462 | $322,867 |
$60,180
652,807
kWh
|
$15,445
-
kW-mo/yr
|
$145,055
-
MMBtu
|
$17,440
-
Tgal
|
$34,422
-
lb
|
$35,920 | ||
TOTAL IMPLEMENTED | $3,253 | $924 |
$3,253
49,321
kWh
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs