Assessment Year | 2005 |
---|---|
Principal Product | Aviation Engines and Airframe Parts |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
100,000
ft2
|
Annual Production | 26,000
pieces
|
Production Hrs. Annual | 4,875
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $400,709 | 8,930,280 |
kWh
|
$0.045 |
Electricity Demand | $140,983 | 29,172 |
kW-mo/yr
|
$4.83 |
Natural Gas | $225,580 | 25,740 |
MMBtu
|
$8.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,277 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,455 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,763 | $1,492 |
$2,976
66,794
kWh
|
$787
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,415 | $45 |
$1,909
42,900
kWh
|
$506
-
kW-mo/yr
|
- | |
03 | 2.2437: Recover waste heat from equipment | $6,432 | $955 | - | - |
$6,432
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,500 | $20,993 |
$5,052
113,503
kWh
|
$1,448
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $738 | $1,792 |
$582
13,104
kWh
|
$156
-
kW-mo/yr
|
- | |
06 | 2.7122: Disconnect ballasts | $1,208 | $1,260 |
$955
21,450
kWh
|
$253
-
kW-mo/yr
|
- | |
07 | 2.7124: Make a practice of turning off lights when not needed | $3,192 | - |
$3,192
71,730
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $4,488 | $4,081 |
$4,488
100,768
kWh
|
- | - | |
09 | 2.7224: Reduce space conditioning during non-working hours | $6,049 | $5,655 |
$3,994
89,751
kWh
|
$1,047
-
kW-mo/yr
|
$1,008
-
MMBtu
|
|
10 | 2.7224: Reduce space conditioning during non-working hours | $13,492 | $9,397 |
$5,081
114,176
kWh
|
$1,611
-
kW-mo/yr
|
$6,800
-
MMBtu
|
|
TOTAL RECOMMENDED | $48,277 | $45,670 |
$28,229
634,176
kWh
|
$5,808
-
kW-mo/yr
|
$14,240
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,455 | $22,485 |
$11,220
252,027
kWh
|
$2,235
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs