| Assessment Year | 2012 |
|---|---|
| Principal Product | steel pipes |
| NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
350,000
ft2
|
| Annual Production | 17,000
ton
|
| Production Hrs. Annual | 8,064
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,369,061 | 67,657,621 |
kWh
|
$0.035 |
| Electricity Demand | $1,112,434 | 125,841 |
kW-mo/yr
|
$8.84 |
| Natural Gas | $172,798 | 33,987 |
MMBtu
|
$5.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $305,568 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $126,615 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,398 | $26,000 |
$25,021
712,858
kWh
|
$9,377
-
kW-mo/yr
|
|
| 02 | 2.7135: Install occupancy sensors | $2,309 | $1,750 |
$2,309
65,797
kWh
|
- | |
| 03 | 2.6218: Turn off equipment when not in use | $2,102 | - |
$2,102
61,320
kWh
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,616 | $30,000 |
$5,616
160,000
kWh
|
- | |
| 05 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $3,111 | $900 |
$3,111
88,630
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $7,299 | $1,160 |
$5,309
151,247
kWh
|
$1,990
-
kW-mo/yr
|
|
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,461 | $850 |
$1,078
30,712
kWh
|
$383
-
kW-mo/yr
|
|
| 08 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $152,137 | $150,000 |
$110,214
3,140,012
kWh
|
$41,923
-
kW-mo/yr
|
|
| 09 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $13,645 | $25,000 |
$10,109
288,000
kWh
|
$3,536
-
kW-mo/yr
|
|
| 10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $83,490 | $112,500 |
$83,490
2,378,640
kWh
|
- | |
| TOTAL RECOMMENDED | $305,568 | $348,160 |
$248,359
7,077,216
kWh
|
$57,209
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $126,615 | $169,400 |
$117,238
3,340,128
kWh
|
$9,377
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs