ITAC Assessment: MZ0101
ITAC logo
ITAC Assessment: MZ0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Rubber & Plastics Hose & Belting
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $50
M
to 100
M
# of Employees 195
Plant Area 293,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,251 2,886,000
kWh
Electricity Demand $20,901 7,394
kW-mo/yr
Natural Gas $97,908 10,735
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,105 $1,160 $1,025
14,647
kWh
$80
-
kW-mo/yr
-
02 2.4223: Install direct acting units in place of compressed air pressure system in safety system $934 $4,969 $737
10,533
kWh
$196
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $6,340 $8,800 - - $6,340
-
MMBtu
04 2.2511: Insulate bare equipment $199 $297 - - $199
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $290 $360 - - $290
-
MMBtu
TOTAL RECOMMENDED $8,867 $15,586 $1,763
25,180
kWh
$276
-
kW-mo/yr
$6,829
-
MMBtu
TOTAL IMPLEMENTED $7,933 $10,617 $1,025
14,647
kWh
$80
-
kW-mo/yr
$6,829
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs