Assessment Year | 2012 |
---|---|
Principal Product | lead acid battery recycling |
NAICS | 335912: Primary Battery Manufacturing |
SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
Sales Range | $5 M to 10M |
# of Employees | 68 |
Plant Area |
55,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $346,629 | 6,780,552 |
kWh
|
$0.051 |
Electricity Demand | $86,754 | 25,481 |
kW-mo/yr
|
$3.40 |
Natural Gas | $379,938 | 151,333 |
MMBtu
|
$2.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,126 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $60,126 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $43,935 | $92,930 |
$39,430
771,629
kWh
|
$4,505
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,582 | $33,200 |
$7,863
154,176
kWh
|
$719
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $2,144 | $2,080 |
$1,813
35,478
kWh
|
$331
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,358 | $940 |
$2,157
42,301
kWh
|
$200
-
kW-mo/yr
|
- | |
05 | 2.2424: Use heat in flue gases to preheat products or materials | $3,108 | $22,500 | - | - |
$3,108
-
MMBtu
|
|
TOTAL RECOMMENDED | $60,126 | $151,650 |
$51,264
1,003,584
kWh
|
$5,755
-
kW-mo/yr
|
$3,108
-
MMBtu
|
||
TOTAL IMPLEMENTED | $60,126 | $151,650 |
$51,264
1,003,584
kWh
|
$5,755
-
kW-mo/yr
|
$3,108
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs