Assessment Year | 2012 |
---|---|
Principal Product | Aluminum castings |
NAICS | 331315: Aluminum Sheet, Plate, and Foil Manufacturing |
SIC | 3365: Aluminum Foundries |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
120,000
ft2
|
Annual Production | 25,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $626,264 | 7,040,200 |
kWh
|
$0.089 |
Electricity Demand | $86,995 | 18,912 |
kW-mo/yr
|
$4.60 |
Natural Gas | $272,974 | 44,333 |
MMBtu
|
$6.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $78,222 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,198 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $1,314 | $1,810 |
$1,314
14,746
kWh
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $3,028 | - |
$3,028
33,984
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,384 | $8,860 |
$3,068
34,428
kWh
|
$317
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $9,426 | $1,160 |
$8,332
93,406
kWh
|
$1,094
-
kW-mo/yr
|
- | |
05 | 2.2424: Use heat in flue gases to preheat products or materials | $10,996 | $10,000 | - | - |
$10,996
-
MMBtu
|
|
06 | 2.4322: Use or replace with energy efficient substitutes | $50,074 | $11,000 |
$45,388
509,400
kWh
|
$4,686
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $78,222 | $32,830 |
$61,129
685,963
kWh
|
$6,097
-
kW-mo/yr
|
$10,996
-
MMBtu
|
||
TOTAL IMPLEMENTED | $64,198 | $22,830 |
$58,101
651,979
kWh
|
$6,097
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs