ITAC Assessment: MZ0088
ITAC logo
ITAC Assessment: MZ0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product HVAC parts
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 211
Plant Area 250,000
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,294 2,938,282
kWh
Electricity Demand $29,370 10,032
kW-mo/yr
Natural Gas $91,939 22,376
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $532 $800 $434
5,867
kWh
$98
-
kW-mo/yr
-
02 2.7492: Use proper thickness of insulation on building envelope $1,179 $11,250 - - $1,179
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,833 - $1,833
24,767
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $2,252 $2,400 $1,837
24,821
kWh
$415
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $698 $1,200 - - $698
-
MMBtu
TOTAL RECOMMENDED $6,495 $15,650 $4,104
55,455
kWh
$513
-
kW-mo/yr
$1,877
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs