Assessment Year | 2012 |
---|---|
Principal Product | commercial printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 145 |
Plant Area |
110,000
ft2
|
Annual Production | 13,500,000
pieces
|
Production Hrs. Annual | 6,860
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $513,977 | 7,175,063 |
kWh
|
$0.072 |
Electricity Demand | $239,817 | 18,237 |
kW-mo/yr
|
$13.15 |
Natural Gas | $6,287 | 758 |
MMBtu
|
$8.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $117,659 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $99,647 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $250 | $600 |
$189
2,636
kWh
|
$61
-
kW-mo/yr
|
|
02 | 2.7135: Install occupancy sensors | $126 | $760 |
$126
1,759
kWh
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $2,256 | $320 |
$1,792
24,990
kWh
|
$464
-
kW-mo/yr
|
|
04 | 2.3135: Schedule routine maintenance during non-operating periods | $10,070 | - |
$7,999
111,563
kWh
|
$2,071
-
kW-mo/yr
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,861 | $1,300 |
$6,660
92,880
kWh
|
$2,201
-
kW-mo/yr
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $41,524 | $1,160 |
$41,524
579,141
kWh
|
- | |
07 | 2.3113: Make ice during off peak hours for cooling | $9,573 | $9,800 | - |
$9,573
-
kW-mo/yr
|
|
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $888 | - |
$172
2,404
kWh
|
$716
-
kW-mo/yr
|
|
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,183 | - |
$4,938
68,864
kWh
|
$1,245
-
kW-mo/yr
|
|
10 | 2.4322: Use or replace with energy efficient substitutes | $34,576 | $40,759 |
$34,576
482,229
kWh
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $889 | $432 |
$706
9,852
kWh
|
$183
-
kW-mo/yr
|
|
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,463 | $8,000 |
$1,867
25,931
kWh
|
$596
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $117,659 | $63,131 |
$100,549
1,402,249
kWh
|
$17,110
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $99,647 | $53,011 |
$93,819
1,308,395
kWh
|
$5,828
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs