ITAC Assessment: MZ0067
ITAC logo
ITAC Assessment: MZ0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product electronic/machined units
NAICS 333993: Packaging Machinery Manufacturing
SIC 3565: Packaging Machinery
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 75,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 4,862
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,100 2,101,500
kWh
Electricity Demand $11,081 6,156
kW-mo/yr
Natural Gas $15,326 2,545
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,468 $17,620 $7,991
107,343
kWh
$477
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,071 $26,900 $23,335
238,637
kWh
$736
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $672 $230 $672
9,600
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,702 $850 $9,702
130,426
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $5,674 - $3,020
43,143
kWh
- $2,654
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,200 $2,200 $1,200
17,142
kWh
- -
TOTAL RECOMMENDED $49,787 $47,800 $45,920
546,291
kWh
$1,213
-
kW-mo/yr
$2,654
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs