| Assessment Year | 2011 |
|---|---|
| Principal Product | electronic/machined units |
| NAICS | 333993: Packaging Machinery Manufacturing |
| SIC | 3565: Packaging Machinery |
| Sales Range | $10 M to 50M |
| # of Employees | 110 |
| Plant Area |
75,000
ft2
|
| Annual Production | 25,000
pieces
|
| Production Hrs. Annual | 4,862
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $148,100 | 2,101,500 |
kWh
|
$0.070 |
| Electricity Demand | $11,081 | 6,156 |
kW-mo/yr
|
$1.80 |
| Natural Gas | $15,326 | 2,545 |
MMBtu
|
$6.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,787 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,468 | $17,620 |
$7,991
107,343
kWh
|
$477
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,071 | $26,900 |
$23,335
238,637
kWh
|
$736
-
kW-mo/yr
|
- | |
| 03 | 2.7135: Install occupancy sensors | $672 | $230 |
$672
9,600
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,702 | $850 |
$9,702
130,426
kWh
|
- | - | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $5,674 | - |
$3,020
43,143
kWh
|
- |
$2,654
-
MMBtu
|
|
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,200 | $2,200 |
$1,200
17,142
kWh
|
- | - | |
| TOTAL RECOMMENDED | $49,787 | $47,800 |
$45,920
546,291
kWh
|
$1,213
-
kW-mo/yr
|
$2,654
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs