Assessment Year | 2010 |
---|---|
Principal Product | machined parts and tooling |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $1 M to 5M |
# of Employees | 25 |
Plant Area |
20,000
ft2
|
Annual Production | 2,500
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,602 | 620,560 |
kWh
|
$0.091 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,344 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,826 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $246 | $100 |
$246
3,470
kWh
|
|
02 | 2.6127: Maintain air filters by cleaning or replacement | $1,628 | $1,000 |
$1,628
21,456
kWh
|
|
03 | 2.7135: Install occupancy sensors | $662 | $560 |
$662
9,330
kWh
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,793 | $4,200 |
$2,793
32,320
kWh
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,039 | $4,580 |
$3,039
37,336
kWh
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $1,304 | $660 |
$1,304
16,889
kWh
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $856 | - |
$856
12,064
kWh
|
|
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,816 | $6,000 |
$3,816
49,414
kWh
|
|
09 | 2.7224: Reduce space conditioning during non-working hours | $24,000 | - |
$24,000
436,360
kWh
|
|
10 | 2.4226: Use / purchase optimum sized compressor | $5,000 | $15,000 |
$5,000
91,000
kWh
|
|
TOTAL RECOMMENDED | $43,344 | $32,100 |
$43,344
709,639
kWh
|
||
TOTAL IMPLEMENTED | $41,826 | $31,540 |
$41,826
688,245
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs