Assessment Year | 2010 |
---|---|
Principal Product | Bottled beverages |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $5 M to 10M |
# of Employees | 102 |
Plant Area |
243,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $712,094 | 12,716,100 |
kWh
|
$0.056 |
Electricity Demand | $60,702 | 29,467 |
kW-mo/yr
|
$2.06 |
Natural Gas | $266,435 | 55,385 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $85,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $7,697 | $1,160 |
$7,697
128,359
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,304 | $73,650 |
$31,304
522,076
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $2,823 | $2,850 |
$2,823
50,407
kWh
|
- | |
04 | 2.6127: Maintain air filters by cleaning or replacement | $2,580 | $1,800 |
$2,580
46,085
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,963 | - |
$1,963
35,045
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,408 | - |
$4,408
78,712
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $544 | $400 |
$544
9,720
kWh
|
- | |
08 | 2.7492: Use proper thickness of insulation on building envelope | $1,123 | $800 | - |
$1,123
-
MMBtu
|
|
09 | 2.2437: Recover waste heat from equipment | $32,817 | $10,000 | - |
$32,817
-
MMBtu
|
|
TOTAL RECOMMENDED | $85,259 | $90,660 |
$51,319
870,404
kWh
|
$33,940
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs