ITAC Assessment: MZ0051
ITAC logo
ITAC Assessment: MZ0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Bottled beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 102
Plant Area 243,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $712,094 12,716,100
kWh
Electricity Demand $60,702 29,467
kW-mo/yr
Natural Gas $266,435 55,385
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $7,697 $1,160 $7,697
128,359
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $31,304 $73,650 $31,304
522,076
kWh
-
03 2.7135: Install occupancy sensors $2,823 $2,850 $2,823
50,407
kWh
-
04 2.6127: Maintain air filters by cleaning or replacement $2,580 $1,800 $2,580
46,085
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,963 - $1,963
35,045
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,408 - $4,408
78,712
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $544 $400 $544
9,720
kWh
-
08 2.7492: Use proper thickness of insulation on building envelope $1,123 $800 - $1,123
-
MMBtu
09 2.2437: Recover waste heat from equipment $32,817 $10,000 - $32,817
-
MMBtu
TOTAL RECOMMENDED $85,259 $90,660 $51,319
870,404
kWh
$33,940
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs