Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product magazines, books
NAICS 323113: Commercial Screen Printing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 96,000
ft2
Annual Production 11,000,000
units
Production Hrs. Annual 6,960
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,348,493 21,622,887
kWh
Electricity Demand $240,411 46,233
kW-mo/yr
Natural Gas $403,031 42,480
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,559

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $48,883 $510,446 $39,060
630,020
kWh
$9,823
-
kW-mo/yr
02 2.4221: Install compressor air intakes in coolest locations $12,294 $8,400 $12,294
198,289
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $840 $850 $840
11,788
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $22,863 - $22,863
380,160
kWh
-
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $15,679 $18,600 $13,427
216,576
kWh
$2,252
-
kW-mo/yr
TOTAL RECOMMENDED $100,559 $538,296 $88,484
1,436,833
kWh
$12,075
-
kW-mo/yr
TOTAL IMPLEMENTED $100,559 $538,296 $88,484
1,436,833
kWh
$12,075
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs