Assessment Year | 2008 |
---|---|
Principal Product | automotive metal stampings |
NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 311 |
Plant Area |
111,350
ft2
|
Annual Production | 3,140,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $259,116 | 5,126,550 |
kWh
|
$0.051 |
Natural Gas | $174,536 | 15,785 |
MMBtu
|
$11.06 |
LPG | $83,436 | 2,903 |
MMBtu
|
$28.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,749 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,081 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $7,405 | $900 |
$7,405
138,642
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,047 | - |
$2,047
38,330
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,216 | $900 |
$1,216
22,733
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,075 | $43,400 |
$32,075
600,499
kWh
|
- | |
05 | 2.7492: Use proper thickness of insulation on building envelope | $6 | $20 | - |
$6
-
MMBtu
|
|
TOTAL RECOMMENDED | $42,749 | $45,220 |
$42,743
800,204
kWh
|
$6
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,081 | $43,420 |
$32,075
600,499
kWh
|
$6
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs