ITAC Assessment: MZ0029
ITAC logo
ITAC Assessment: MZ0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product automotive metal stampings
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 311
Plant Area 111,350
ft2
Annual Production 3,140,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,116 5,126,550
kWh
Natural Gas $174,536 15,785
MMBtu
LPG $83,436 2,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,081

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $7,405 $900 $7,405
138,642
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,047 - $2,047
38,330
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,216 $900 $1,216
22,733
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $32,075 $43,400 $32,075
600,499
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $6 $20 - $6
-
MMBtu
TOTAL RECOMMENDED $42,749 $45,220 $42,743
800,204
kWh
$6
-
MMBtu
TOTAL IMPLEMENTED $32,081 $43,420 $32,075
600,499
kWh
$6
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs