ITAC Assessment: MZ0027
ITAC logo
ITAC Assessment: MZ0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Metal cases
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 122
Plant Area 85,000
ft2
Annual Production 210,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,019 3,242,700
kWh
Natural Gas $159,790 19,295
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,077 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $4,642 $900 $4,642
58,476
kWh
-
02 2.1122: Re-size charging openings or add a movable door on equipment $514 $1,400 - $514
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,465 $1,400 $3,465
43,300
kWh
-
04 2.2515: Use optimum thickness insulation $76 $300 - $76
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,444 $30,600 $9,444
120,058
kWh
-
06 2.2447: Heat water with exhaust heat $9,936 $10,000 - $9,936
-
MMBtu
TOTAL RECOMMENDED $28,077 $44,600 $17,551
221,834
kWh
$10,526
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs