ITAC Assessment: BS0054
ITAC logo
ITAC Assessment: BS0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Metal Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 53,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 7,900
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,263 3,261,060
kWh
Electricity Demand $19,203 5,727
kW-mo/yr
Natural Gas $10,447 1,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,085 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $741 $1,255 $643
15,677
kWh
- $98
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29 $45 $29
700
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $597 $4,830 $486
11,862
kWh
$111
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $268 $9 $268
6,522
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $75 $374 $67
1,645
kWh
$8
-
kW-mo/yr
-
06 2.7492: Use proper thickness of insulation on building envelope $5,375 $50,351 $5,375
131,093
kWh
- -
TOTAL RECOMMENDED $7,085 $56,864 $6,868
167,499
kWh
$119
-
kW-mo/yr
$98
TOTAL IMPLEMENTED $701 $5,249 $582
14,207
kWh
$119
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs