| Assessment Year | 2015 |
|---|---|
| Principal Product | Metal Parts |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
53,000
ft2
|
| Annual Production | 300,000
pieces
|
| Production Hrs. Annual | 7,900
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $135,263 | 3,261,060 |
kWh
|
$0.041 |
| Electricity Demand | $19,203 | 5,727 |
kW-mo/yr
|
$3.35 |
| Natural Gas | $10,447 | 1,265 |
MMBtu
|
$8.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,085 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $701 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $741 | $1,255 |
$643
15,677
kWh
|
- | $98 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29 | $45 |
$29
700
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $597 | $4,830 |
$486
11,862
kWh
|
$111
-
kW-mo/yr
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $268 | $9 |
$268
6,522
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $75 | $374 |
$67
1,645
kWh
|
$8
-
kW-mo/yr
|
- | |
| 06 | 2.7492: Use proper thickness of insulation on building envelope | $5,375 | $50,351 |
$5,375
131,093
kWh
|
- | - | |
| TOTAL RECOMMENDED | $7,085 | $56,864 |
$6,868
167,499
kWh
|
$119
-
kW-mo/yr
|
$98 | ||
| TOTAL IMPLEMENTED | $701 | $5,249 |
$582
14,207
kWh
|
$119
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs