ITAC Assessment: MZ0026
ITAC logo
ITAC Assessment: MZ0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Electrical meter sockets and related components, powder coating
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $1
M
to 5
M
# of Employees 68
Plant Area 61,000
ft2
Annual Production 55,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,491 1,119,480
kWh
Natural Gas $67,646 5,988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $1,366 $900 $1,128
14,100
kWh
$238
-
kW-mo/yr
02 2.7135: Install occupancy sensors $427 $178 $427
4,410
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,275 $20,400 $3,275
3,792
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,898 $1,360 $1,898
19,485
kWh
-
TOTAL RECOMMENDED $6,966 $22,838 $6,728
41,787
kWh
$238
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs