Assessment Year | 2008 |
---|---|
Principal Product | plastic pipe |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $10 M to 50M |
# of Employees | 43 |
Plant Area |
150,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 8,592
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $457,186 | 9,214,720 |
kWh
|
$0.050 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,827 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,932 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4237: Substitute compressed air cooling with water or air cooling | $20,665 | $20,000 |
$20,665
426,077
kWh
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $3,575 | $900 |
$3,575
68,118
kWh
|
|
03 | 2.4226: Use / purchase optimum sized compressor | $10,015 | $5,000 |
$10,015
200,301
kWh
|
|
04 | 2.7144: Install spectral reflectors / delamp | $565 | $40 |
$565
7,614
kWh
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,112 | $21,425 |
$11,112
197,186
kWh
|
|
06 | 2.7135: Install occupancy sensors | $855 | $740 |
$855
4,528
kWh
|
|
07 | 2.7135: Install occupancy sensors | $40 | $190 |
$40
790
kWh
|
|
TOTAL RECOMMENDED | $46,827 | $48,295 |
$46,827
904,614
kWh
|
||
TOTAL IMPLEMENTED | $45,932 | $47,365 |
$45,932
899,296
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs