ITAC Assessment: MZ0021
ITAC logo
ITAC Assessment: MZ0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product plastic pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 150,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,592
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,186 9,214,720
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4237: Substitute compressed air cooling with water or air cooling $20,665 $20,000 $20,665
426,077
kWh
02 2.4221: Install compressor air intakes in coolest locations $3,575 $900 $3,575
68,118
kWh
03 2.4226: Use / purchase optimum sized compressor $10,015 $5,000 $10,015
200,301
kWh
04 2.7144: Install spectral reflectors / delamp $565 $40 $565
7,614
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,112 $21,425 $11,112
197,186
kWh
06 2.7135: Install occupancy sensors $855 $740 $855
4,528
kWh
07 2.7135: Install occupancy sensors $40 $190 $40
790
kWh
TOTAL RECOMMENDED $46,827 $48,295 $46,827
904,614
kWh
TOTAL IMPLEMENTED $45,932 $47,365 $45,932
899,296
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs