ITAC Assessment: MZ0012
ITAC logo
ITAC Assessment: MZ0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Fabric and membrane filter media used for control of air emissions.
NAICS 313310: Textile and Fabric Finishing Mills
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 87,000
ft2
Annual Production 1
units
Production Hrs. Annual 5,100
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,730 2,140,345
kWh
Natural Gas $40,689 29,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4226: Use / purchase optimum sized compressor $5,875 $2,507 $5,875
65,275
kWh
02 2.6122: Adjust vents to minimize energy use $16,589 $10,500 $16,589
184,320
kWh
03 2.2511: Insulate bare equipment $13,756 $500 $13,756
152,848
kWh
04 2.4221: Install compressor air intakes in coolest locations $574 $900 $574
6,793
kWh
05 2.7135: Install occupancy sensors $215 $180 $215
2,394
kWh
TOTAL RECOMMENDED $37,009 $14,587 $37,009
411,630
kWh
TOTAL IMPLEMENTED $6,664 $3,587 $6,664
74,462
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs