ITAC Assessment: MUCM22
ITAC logo
ITAC Assessment: MUCM22
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Education
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 345
Plant Area 79,450
ft2
Annual Production 100
units
Production Hrs. Annual 1,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,719 554,348
kWh
Electricity Fees $1,962 -
Natural Gas $22,619 5,645
MMBtu
Other Gas $17,616 1
MMBtu
Waste Disposal Costs
Water Usage $36,130 1,443
Tgal
TOTAL YEARLY COSTS $148,046
RECOMMENDED SAVINGS* $14,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 2.4322: Use or replace with energy efficient substitutes $1,932 $1,165 $1,932
14,863
kWh
- -
02 2.7134: Use photocell controls $368 $772 $368
2,834
kWh
- -
03 2.7135: Install occupancy sensors $3,716 $2,058 $3,716
28,588
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,942 $3,096 $3,942
30,321
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $427 $1,050 $427
3,285
kWh
- -
06 2.7444: Close holes and openings in building such as broken windows $67 $270 $36
280
kWh
$30
-
MMBtu
-
07 2.7492: Use proper thickness of insulation on building envelope $284 $1,021 $155
1,194
kWh
$129
-
MMBtu
-
08 3.4151: Minimize water usage $3,394 $23,705 - - $3,394
-
Tgal
TOTAL RECOMMENDED $14,130 $33,137 $10,577
81,365
kWh
$159
-
MMBtu
$3,394
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs