ITAC Assessment: MUCM17
ITAC logo
ITAC Assessment: MUCM17
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product testing of seats, control modules, latches, doors, and related motor vehicle components
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 5013: Motor Vehicle Supplies and New Parts
Sales Range less than $500
k
# of Employees 350
Plant Area 123,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,040 3,210,215
kWh
Electricity Demand $274,354 8,119
kW-mo/yr
Electricity Fees $15,643 -
Natural Gas $31,726 3,312
MMBtu
Waste Disposal Costs
Water Usage $26,592 3,123
Tgal
TOTAL YEARLY COSTS $495,356
RECOMMENDED SAVINGS* $15,477 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,256

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2437: Recover waste heat from equipment $1,804 $2,090 $1,804
36,074
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $3,295 $791 $1,536
29,599
kWh
$1,759
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $305 $170 $305
5,700
kWh
-
04 2.7135: Install occupancy sensors $117 $299 $66
1,157
kWh
$51
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,951 $26,757 $5,491
99,322
kWh
$4,460
-
kW-mo/yr
06 2.7444: Close holes and openings in building such as broken windows $5 $16 $5
80
kWh
-
TOTAL RECOMMENDED $15,477 $30,123 $9,207
171,932
kWh
$6,270
-
kW-mo/yr
TOTAL IMPLEMENTED $10,256 $26,927 $5,796
105,022
kWh
$4,460
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs