ITAC Assessment: MUCM08
ITAC logo
ITAC Assessment: MUCM08
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Education
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 80
Plant Area 62,075
ft2
Annual Production 1,500
units
Production Hrs. Annual 1,995
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,006 23,656
kWh
Natural Gas $2,060 218
MMBtu
Waste Disposal Costs
Water Usage $8,530 1,421
Tgal
TOTAL YEARLY COSTS $14,596
RECOMMENDED SAVINGS* $2,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,415

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 2.2135: Repair and eliminate steam leaks $1,313 $4,706 - $1,313
-
MMBtu
-
02 2.6232: Install set-back timers $792 $428 $792
4,688
kWh
- -
03 3.4151: Minimize water usage $350 $102 - - $350
-
Tgal
04 2.6218: Turn off equipment when not in use $272 $1,280 $272
1,672
kWh
- -
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $59 $130 - $59
-
MMBtu
-
TOTAL RECOMMENDED $2,787 $6,646 $1,065
6,359
kWh
$1,372
-
MMBtu
$350
-
Tgal
TOTAL IMPLEMENTED $1,415 $1,810 $1,065
6,359
kWh
- $350
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs