| Assessment Year | 2025 |
|---|---|
| Principal Product | aluminum products |
| NAICS | 332313: Plate Work Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $100 M to 500M |
| # of Employees | 300 |
| Plant Area |
320,000
ft2
|
| Annual Production | 30,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $466,063 | 10,260,908 |
kWh
|
$0.045 |
| Electricity Demand | $515,379 | 21,731 |
kW-mo/yr
|
$23.72 |
| Electricity Fees | $50,582 | - |
|
- |
| Natural Gas | $66,866 | 47,021 |
MMBtu
|
$1.42 |
| Other Gas | $44,573 | 1 |
MMBtu
|
$44,573.00 |
| TOTAL YEARLY COSTS | $1,143,463 | |||
| RECOMMENDED SAVINGS* | $28,192 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3132: Recharge batteries on during off-peak demand periods | $13,036 | $2,070 | - |
$12,294
-
kW-mo/yr
|
$741 | - | |
| 02 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $8,641 | $62,943 | - | - | - |
$8,641
-
MMBtu
|
|
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,396 | $4,121 |
$(-53.0)
(-1,166)
kWh
|
$(-461.0)
-
kW-mo/yr
|
- |
$2,910
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $57 | $80 |
$33
736
kWh
|
$24
-
kW-mo/yr
|
- | - | |
| 05 | 2.6125: Keep equipment clean | $1,593 | - |
$795
17,503
kWh
|
$798
-
kW-mo/yr
|
- | - | |
| 06 | 2.7224: Reduce space conditioning during non-working hours | $654 | - |
$148
3,278
kWh
|
$457
-
kW-mo/yr
|
- |
$50
-
MMBtu
|
|
| 07 | 2.7496: Install partitions to reduce size of conditioned space | $1,816 | $2,353 |
$237
5,269
kWh
|
$1,579
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $28,192 | $71,567 |
$1,159
25,620
kWh
|
$14,691
-
kW-mo/yr
|
$741 |
$11,600
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs