ITAC Assessment: MU0077
ITAC logo
ITAC Assessment: MU0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product aluminum products
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 320,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $466,063 10,260,908
kWh
Electricity Demand $515,379 21,731
kW-mo/yr
Electricity Fees $50,582 -
Natural Gas $66,866 47,021
MMBtu
Other Gas $44,573 1
MMBtu
TOTAL YEARLY COSTS $1,143,463
RECOMMENDED SAVINGS* $29,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3132: Recharge batteries on during off-peak demand periods $13,036 $2,070 $741
74,131
kWh
$12,294
-
kW-mo/yr
-
02 2.2449: Recover heat from exhausted steam, hot air or hot water $8,641 $62,943 - - $8,641
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $3,424 $4,121 $53
1,166
kWh
$461
-
kW-mo/yr
$2,910
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $57 $80 $33
736
kWh
$24
-
kW-mo/yr
-
05 2.6125: Keep equipment clean $1,593 - $795
17,503
kWh
$798
-
kW-mo/yr
-
06 2.7224: Reduce space conditioning during non-working hours $1,230 - $266
3,278
kWh
$915
-
kW-mo/yr
$50
-
MMBtu
07 2.7496: Install partitions to reduce size of conditioned space $1,816 $2,353 $237
5,269
kWh
$1,579
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,796 $71,567 $2,125
102,083
kWh
$16,071
-
kW-mo/yr
$11,600
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs