Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Fabricated Sheet Metal Products
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 150,000
ft2
Annual Production 2,300,000
pieces
Production Hrs. Annual 6,032
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,864 4,698,965
kWh
Electricity Demand $320,198 9,749
kW-mo/yr
Electricity Fees $31,065 -
Natural Gas $25,850 18,004
MMBtu
Other Gas $39,895 1
MMBtu
TOTAL YEARLY COSTS $586,871
RECOMMENDED SAVINGS* $115,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $226 - $85
2,152
kWh
$141
-
kW-mo/yr
- -
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $762 $362 $290
7,238
kWh
$473
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $302 $550 $115
2,870
kWh
$188
-
kW-mo/yr
- -
04 2.7232: Replace existing hvac unit with high efficiency model $49,773 $560,225 $4,794
119,585
kWh
$34,138
-
kW-mo/yr
$841
-
MMBtu
$10,000
05 2.7444: Close holes and openings in building such as broken windows $189 $627 $54
1,351
kWh
$61
-
kW-mo/yr
$75
-
MMBtu
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $4,303 $4,440 $655
16,375
kWh
$3,102
-
kW-mo/yr
$546
-
MMBtu
-
07 2.7492: Use proper thickness of insulation on building envelope $251 $242 $37
913
kWh
$164
-
kW-mo/yr
$50
-
MMBtu
-
08 2.7492: Use proper thickness of insulation on building envelope $116 $193 $29
720
kWh
$47
-
kW-mo/yr
$40
-
MMBtu
-
09 2.9114: Use solar heat to make electricty $59,971 $561,792 $22,774
569,358
kWh
$37,197
-
kW-mo/yr
- -
TOTAL RECOMMENDED $115,894 $1,128,431 $28,832
720,563
kWh
$75,510
-
kW-mo/yr
$1,552
-
MMBtu
$10,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs