Assessment Year | 2025 |
---|---|
Principal Product | Blenders |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 112 |
Plant Area |
73,600
ft2
|
Annual Production | 700
units
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,923 | 743,194 |
kWh
|
$0.067 |
Electricity Demand | $45,597 | 3,216 |
kW-mo/yr
|
$14.18 |
Electricity Fees | $9,121 | - |
|
- |
Natural Gas | $22,679 | 2,903 |
MMBtu
|
$7.81 |
Other Energy | $3,637 | 1 |
MMBtu
|
$3,637.00 |
TOTAL YEARLY COSTS | $130,957 | |||
RECOMMENDED SAVINGS* | $18,786 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2514: Cover open tanks | $10,932 | $2,523 |
$10,674
159,320
kWh
|
$258
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $1,013 | $1,482 |
$785
11,715
kWh
|
$228
-
kW-mo/yr
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,416 | $780 |
$655
9,772
kWh
|
$761
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,453 | $260 |
$1,134
16,932
kWh
|
$1,319
-
kW-mo/yr
|
|
05 | 2.7111: Reduce illumination to minimum necessary levels | $216 | - |
$100
1,494
kWh
|
$116
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $2,520 | $98 |
$2,520
37,609
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $235 | $530 |
$109
1,625
kWh
|
$127
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $18,786 | $5,673 |
$15,977
238,467
kWh
|
$2,809
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs