ITAC Assessment: MU0029
ITAC logo
ITAC Assessment: MU0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 10,000
ft2
Annual Production 2,250
bbl
Production Hrs. Annual 3,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,152 397,200
kWh
Electricity Demand $20,830 1,089
kW-mo/yr
Electricity Fees $5,126 -
Natural Gas $19,525 2,142
MMBtu
TOTAL YEARLY COSTS $75,633
RECOMMENDED SAVINGS* $4,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $295 $324 - - $295
-
MMBtu
02 2.2626: Avoid frost formation on evaporators $701 $1,968 $701
8,760
kWh
- -
03 2.2696: Use excess cold process fluid for industrial cooling needs $1,793 $7,905 $1,352
16,903
kWh
$441
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,500 $79 $54
706
kWh
$1,446
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $178 - $178
2,220
kWh
- -
TOTAL RECOMMENDED $4,466 $10,276 $2,284
28,589
kWh
$1,887
-
kW-mo/yr
$295
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs