ITAC Assessment: CO0568
ITAC logo
ITAC Assessment: CO0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Printed Circuit Boards
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 28,000
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,774 2,726,342
kWh
Electricity Demand $84,060 6,355
kW-mo/yr
Electricity Fees $960 -
Natural Gas $43,567 6,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,270 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,960

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,510 $330 $1,480
44,000
kWh
$1,030
-
kW-mo/yr
- - - -
02 2.4226: Use / purchase optimum sized compressor $540 - $540
16,000
kWh
- - - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $350 $1,140 $230
6,700
kWh
$120
-
kW-mo/yr
- - - -
04 2.8112: Combine utility meters $10,660 $43,050 - $10,630
-
kW-mo/yr
- - $30 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,100 $6,680 $2,040
60,700
kWh
$1,810
-
kW-mo/yr
- $120 - $130
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,690 $6,440 $1,540
45,800
kWh
$1,070
-
kW-mo/yr
- - - $80
07 2.7142: Utilize higher efficiency lamps and/or ballasts $660 $2,400 $120
3,500
kWh
$70
-
kW-mo/yr
- $230 - $240
08 2.2437: Recover waste heat from equipment $400 $1,750 - - $400
-
MMBtu
- - -
09 2.9112: Use solar heat to heat water $360 $1,510 - - $360
-
MMBtu
- - -
TOTAL RECOMMENDED $22,270 $63,300 $5,950
176,700
kWh
$14,730
-
kW-mo/yr
$760
-
MMBtu
$350 $30 $450
TOTAL IMPLEMENTED $9,960 $15,850 $5,180
154,000
kWh
$3,980
-
kW-mo/yr
- $350 - $450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs