Assessment Year | 2005 |
---|---|
Principal Product | Printed Circuit Boards |
NAICS | 334412: Bare Printed Circuit Board Manufacturing |
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
28,000
ft2
|
Annual Production | 12,000
pieces
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $80,774 | 2,726,342 |
kWh
|
$0.030 |
Electricity Demand | $84,060 | 6,355 |
kW-mo/yr
|
$13.23 |
Electricity Fees | $960 | - |
|
- |
Natural Gas | $43,567 | 6,054 |
MMBtu
|
$7.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,270 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,960 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,510 | $330 |
$1,480
44,000
kWh
|
$1,030
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $540 | - |
$540
16,000
kWh
|
- | - | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $350 | $1,140 |
$230
6,700
kWh
|
$120
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.8112: Combine utility meters | $10,660 | $43,050 | - |
$10,630
-
kW-mo/yr
|
- | - | $30 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,100 | $6,680 |
$2,040
60,700
kWh
|
$1,810
-
kW-mo/yr
|
- | $120 | - | $130 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,690 | $6,440 |
$1,540
45,800
kWh
|
$1,070
-
kW-mo/yr
|
- | - | - | $80 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $660 | $2,400 |
$120
3,500
kWh
|
$70
-
kW-mo/yr
|
- | $230 | - | $240 | |
08 | 2.2437: Recover waste heat from equipment | $400 | $1,750 | - | - |
$400
-
MMBtu
|
- | - | - | |
09 | 2.9112: Use solar heat to heat water | $360 | $1,510 | - | - |
$360
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $22,270 | $63,300 |
$5,950
176,700
kWh
|
$14,730
-
kW-mo/yr
|
$760
-
MMBtu
|
$350 | $30 | $450 | ||
TOTAL IMPLEMENTED | $9,960 | $15,850 |
$5,180
154,000
kWh
|
$3,980
-
kW-mo/yr
|
- | $350 | - | $450 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs