ITAC Assessment: MU0026
ITAC logo
ITAC Assessment: MU0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product they build assembly line machinery
NAICS 333519: Rolling Mill and Other Metalworking Machinery Manufacturing
SIC 3549: Metalworking Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 500,000
ft2
Annual Production 58
units
Production Hrs. Annual 4,416
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,015 2,505,600
kWh
Electricity Demand $85,737 5,008
kW-mo/yr
Electricity Fees $49,625 -
Natural Gas $368,849 44,349
MMBtu
TOTAL YEARLY COSTS $619,226
RECOMMENDED SAVINGS* $151,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $127,763

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,370 $6,347 $12,015
240,300
kWh
$6,355
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $905 $133 $469
9,382
kWh
$436
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $101,263 - - - - $101,263
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $181 - $123
2,460
kWh
$58
-
kW-mo/yr
- -
05 2.7134: Use photocell controls $88 $349 $88
1,750
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $419 $1,650 $285
5,694
kWh
$134
-
kW-mo/yr
- -
07 2.7221: Lower temperature during the winter season and vice-versa $4,405 - $1,123
22,466
kWh
$336
-
kW-mo/yr
- $2,946
-
MMBtu
08 2.7447: Install vinyl strip / high speed / air curtain doors $23,547 $85,720 $(-805.0)
16,099
kWh
- - $24,352
-
MMBtu
09 2.7492: Use proper thickness of insulation on building envelope $211 $522 - - - $211
-
MMBtu
10 2.8121: Apply for tax-free status for energy purchases $2,402 - - - $2,402 -
TOTAL RECOMMENDED $151,790 $94,721 $13,298
298,151
kWh
$7,319
-
kW-mo/yr
$2,402 $128,772
-
MMBtu
TOTAL IMPLEMENTED $127,763 $8,130 $13,892
277,842
kWh
$7,261
-
kW-mo/yr
$2,402 $104,209
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs