Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Office Space and Labs
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 190
Plant Area 58,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,689 1,001,988
kWh
Electricity Demand $24,360 2,717
kW-mo/yr
Electricity Fees $8,646 -
Natural Gas $41,259 5,059
MMBtu
TOTAL YEARLY COSTS $156,953
RECOMMENDED SAVINGS* $171,866 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $116,487 $542,440 $71,188
857,654
kWh
$45,299
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $3,362 $3,159 $2,966
35,741
kWh
$395
-
kW-mo/yr
-
03 2.6213: Turn off steam / hot water lines leading to space heating units $6,404 - $4,273
51,480
kWh
$2,131
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $464 $614 $251
3,020
kWh
$213
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,515 $419 $1,132
13,644
kWh
$383
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $344 $625 $266
3,206
kWh
$78
-
kW-mo/yr
-
07 2.7224: Reduce space conditioning during non-working hours $1,681 $2,178 $946
11,400
kWh
- $734
-
MMBtu
08 2.7261: Install timers and/or thermostats $3,945 $1,100 $68
816
kWh
$3,088
-
kW-mo/yr
$790
-
MMBtu
09 2.4322: Use or replace with energy efficient substitutes $125 $580 $105
1,262
kWh
$20
-
kW-mo/yr
-
10 2.7425: Clean or color roof to reduce solar load $23,488 $41,533 $15,460
186,267
kWh
$8,028
-
kW-mo/yr
-
11 2.7444: Close holes and openings in building such as broken windows $304 $256 $172
2,121
kWh
$42
-
kW-mo/yr
$90
-
MMBtu
12 2.2511: Insulate bare equipment $13,748 $5,386 - - $13,748
-
MMBtu
TOTAL RECOMMENDED $171,866 $598,290 $96,827
1,166,611
kWh
$59,677
-
kW-mo/yr
$15,362
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs