ITAC Assessment: MU0006
ITAC logo
ITAC Assessment: MU0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Automotive Switches
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 107,000
ft2
Annual Production 150,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,706 1,361,376
kWh
Electricity Demand $48,509 3,408
kW-mo/yr
Electricity Fees $23,256 -
Natural Gas $15,122 2,182
MMBtu
TOTAL YEARLY COSTS $196,593
RECOMMENDED SAVINGS* $5,253 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $1,166 $2,987 $1,166
11,669
kWh
- -
02 2.7291: Reschedule and rearrange multiple-source heating systems $435 $162 $364
3,640
kWh
$71
-
kW-mo/yr
-
03 2.6211: Conserve energy by efficient use of vending machines $1,108 $305 $1,108
11,081
kWh
- -
04 2.7444: Close holes and openings in building such as broken windows $363 $121 $14
142
kWh
- $348
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,181 $480 $1,366
13,655
kWh
$815
-
kW-mo/yr
-
TOTAL RECOMMENDED $5,253 $4,054 $4,018
40,187
kWh
$886
-
kW-mo/yr
$348
-
MMBtu
TOTAL IMPLEMENTED $1,543 $467 $1,472
14,721
kWh
$71
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs