ITAC Assessment: MS0474
ITAC logo
ITAC Assessment: MS0474
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Metal Seat Frames
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $100
M
to 500
M
# of Employees 625
Plant Area 425,278
ft2
Annual Production 34,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $827,387 10,339,604
kWh
Electricity Demand $265,821 21,511
kW-mo/yr
Electricity Fees $12,203 -
Natural Gas $48,420 5,320
MMBtu
Waste Disposal Costs
Water Usage $5,347 1,330
Tgal
Water Disposal $8,182 1,302
Tgal
TOTAL YEARLY COSTS $1,167,360
RECOMMENDED SAVINGS* $143,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,542 $4,076 $8,542
106,778
kWh
-
02 2.7261: Install timers and/or thermostats $43,920 $18,347 $43,920
548,991
kWh
-
03 2.7232: Replace existing hvac unit with high efficiency model $7,757 $94,500 $7,175
89,685
kWh
$582
-
kW-mo/yr
04 2.7243: Improve air circulation with destratification fans / other methods $523 - $523
6,547
kWh
-
05 4.721: Initiate a program to acquire iso certification $82,739 $1,000 $82,739
1,034,238
kWh
-
06 2.7135: Install occupancy sensors $282 $1,277 $282
3,526
kWh
-
TOTAL RECOMMENDED $143,763 $119,200 $143,181
1,789,765
kWh
$582
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs