Assessment Year | 1995 |
---|---|
Principal Product | Offset Lithographic Printings |
NAICS |
n/a
|
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
44,100
ft2
|
Annual Production | 2,500
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,603 | 1,423,212 |
kWh
|
$0.059 |
Natural Gas | $2,318 | 517 |
MMBtu
|
$4.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,767 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,449 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,583 | $50 |
$9,583
163,247
kWh
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $191 | $20 |
$191
3,224
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,580 | $2,038 |
$3,580
60,961
kWh
|
- | - | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $2,678 | - |
$2,678
-
kWh
|
- | - | - | |
05 | 3.5121: Recycle waste ink and cleanup solvent | $5,575 | $11,265 | - |
$1,575
-
gal
|
- | $4,000 | |
06 | 3.5121: Recycle waste ink and cleanup solvent | $10,120 | - | - | - |
$10,120
-
lb
|
- | |
07 | 3.5241: Sell used plates to an aluminum recycler | $40 | $75 | - | - |
$40
-
lb
|
- | |
TOTAL RECOMMENDED | $31,767 | $13,448 |
$16,032
227,432
kWh
|
$1,575
-
gal
|
$10,160
-
lb
|
$4,000 | ||
TOTAL IMPLEMENTED | $6,449 | $2,058 |
$6,449
64,185
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs