ITAC Assessment: MS0467
ITAC logo
ITAC Assessment: MS0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Engine Components
NAICS 333618: Other Engine Equipment Manufacturing
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 415
Plant Area 794,094
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $653,313 11,262,955
kWh
Electricity Demand $275,003 27,735
kW-mo/yr
Electricity Fees $80,862 -
Natural Gas $41,531 3,398
MMBtu
Waste Disposal Costs
Water Usage $35,584 5,862
Tgal
Water Disposal $35,584 5,862
Tgal
TOTAL YEARLY COSTS $1,121,877
RECOMMENDED SAVINGS* $43,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,030 $2,244 $8,030
138,448
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $5,879 $1,680 $5,879
101,367
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $10,936 - $10,936
188,549
kWh
-
04 2.3212: Optimize plant power factor $18,243 $121,000 - $18,243
-
kW-mo/yr
TOTAL RECOMMENDED $43,088 $124,924 $24,845
428,364
kWh
$18,243
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs