Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product electroplated parts
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 123
Plant Area 40,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 3,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,069 627,932
kWh
Electricity Demand $20,003 2,484
kW-mo/yr
Electricity Fees $(-1,688.0) -
Natural Gas $61,112 7,573
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $534,828 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,802 - $1,434
12,708
kWh
$368
-
kW-mo/yr
- - - -
02 2.4239: Eliminate or reduce compressed air usage $2,857 $300 $2,273
20,142
kWh
$584
-
kW-mo/yr
- - - -
03 2.4131: Size electric motors for peak operating efficiency $85 - $62
545
kWh
$16
-
kW-mo/yr
$7 - - -
04 2.4133: Use most efficient type of electric motors $160 $80 $127
1,122
kWh
$33
-
kW-mo/yr
- - - -
05 4.121: Maintain clean conditions before painting $233,065 $1,000 $3,632
32,179
kWh
- - $4,561
-
MMBtu
$(-19,562.0) $244,434
06 4.121: Maintain clean conditions before painting $292,248 $4,925 $4,146
36,734
kWh
- - $3,557
-
MMBtu
- $284,545
07 2.7111: Reduce illumination to minimum necessary levels $4,611 $1,814 $3,782
31,159
kWh
$829
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $534,828 $8,119 $15,456
134,589
kWh
$1,830
-
kW-mo/yr
$7 $8,118
-
MMBtu
$(-19,562.0) $528,979
TOTAL IMPLEMENTED $2,857 $300 $2,273
20,142
kWh
$584
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings