| Assessment Year | 1995 |
|---|---|
| Principal Product | X-Ray Tubes |
| NAICS |
n/a
|
| SIC | 3844: X-Ray Apparatus and Tubes and Related Irradiation Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
300,000
ft2
|
| Annual Production | 6,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $307,587 | 4,973,916 |
kWh
|
$0.062 |
| Natural Gas | $49,587 | 17,663 |
MMBtu
|
$2.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,371 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $6,770 | - | n/a | - |
$6,770
-
MMBtu
|
- |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,306 | $7,683 | n/a |
$3,306
53,634
kWh
|
- | - |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $2,174 | - | n/a |
$2,174
35,170
kWh
|
- | - |
| 04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $2,365 | $7,000 | n/a |
$2,365
38,394
kWh
|
- | - |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,029 | $2,000 | n/a |
$2,029
32,825
kWh
|
- | - |
| 06 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $1,958 | - | n/a |
$3,460
41,911
kWh
|
$(-1,502.0)
-
MMBtu
|
- |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $540 | $960 | n/a |
$540
8,792
kWh
|
- | - |
| 08 | 2.2511: Insulate bare equipment | $369 | $49 | n/a |
$369
5,862
kWh
|
- | - |
| 09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,860 | - | n/a | - | - |
$2,860
-
lb
|
| TOTAL RECOMMENDED | $22,371 | $17,692 |
$14,243
216,588
kWh
|
$5,268
-
MMBtu
|
$2,860
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs