ITAC Assessment: MS0416
ITAC logo
ITAC Assessment: MS0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Airport
NAICS 488190: Other Support Activities for Air Transportation
SIC 4581: Airports, Flying Fields, and Airport Terminal Services
Sales Range less than $500
k
# of Employees 20
Plant Area 50,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,844 981,247
kWh
Electricity Demand $18,322 1,511
kW-mo/yr
Electricity Fees $1,007 -
Natural Gas $19,211 1,333
MMBtu
Waste Disposal Costs
Water Usage $6,938 2,197
Tgal
TOTAL YEARLY COSTS $149,321
RECOMMENDED SAVINGS* $10,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $252 $959 $194
1,830
kWh
- $58
-
MMBtu
02 2.9114: Use solar heat to make electricty $4,534 $30,450 $4,534
42,769
kWh
- -
03 2.1224: Replace boiler $3,245 $25,658 - - $3,245
-
MMBtu
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,420 - $2,420
22,830
kWh
- -
05 2.8114: Change rate schedules or other changes in utility service $451 - - $451 -
TOTAL RECOMMENDED $10,902 $57,067 $7,147
67,429
kWh
$451 $3,303
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs