ITAC Assessment: MS0398
ITAC logo
ITAC Assessment: MS0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product UAV
NAICS 541380: Testing Laboratories
SIC 8734: Testing Laboratories
Sales Range less than $500
k
# of Employees 53
Plant Area 55,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,250
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,060 846,720
kWh
Electricity Demand $24,237 2,253
kW-mo/yr
Natural Gas $27,459 2,369
MMBtu
Waste Disposal Costs
Water Usage $388 92,590
Tgal
TOTAL YEARLY COSTS $114,145
RECOMMENDED SAVINGS* $19,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,227 $6,769 $4,912
67,010
kWh
$315
-
kW-mo/yr
-
02 2.7444: Close holes and openings in building such as broken windows $8,148 $536 $1,075
14,656
kWh
- $7,073
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,341 $3,593 $6,341
86,534
kWh
- -
TOTAL RECOMMENDED $19,716 $10,898 $12,328
168,200
kWh
$315
-
kW-mo/yr
$7,073
-
MMBtu
TOTAL IMPLEMENTED $5,227 $6,769 $4,912
67,010
kWh
$315
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs