ITAC Assessment: MS0330
ITAC logo
ITAC Assessment: MS0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 75,000
ft2
Annual Production 540,000,000
pieces
Production Hrs. Annual 8,112
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,774 8,885,400
kWh
Electricity Demand $54,730 13,898
kW-mo/yr
Electricity Fees $62,306 -
Natural Gas $478,247 54,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $21,490 $1,800 - - - $21,490
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $15,879 $1,000 - - - $15,879
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,253 $401 $10,706
321,129
kWh
- $1,547 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,975 $17,657 $5,356
160,719
kWh
$833
-
kW-mo/yr
$786 -
05 2.2135: Repair and eliminate steam leaks $2,517 $94 - - - $2,517
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,629 $8,225 $1,206
36,189
kWh
$245
-
kW-mo/yr
$178 -
07 2.4221: Install compressor air intakes in coolest locations $1,094 $1,050 $778
23,365
kWh
$200
-
kW-mo/yr
$116 -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $631 $4,158 $629
16,550
kWh
- $2 -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $442 $2,040 $163
4,885
kWh
$252
-
kW-mo/yr
$27 -
TOTAL RECOMMENDED $62,910 $36,425 $18,838
562,837
kWh
$1,530
-
kW-mo/yr
$2,656 $39,886
-
MMBtu
TOTAL IMPLEMENTED $58,226 $29,083 $17,268
518,037
kWh
$1,078
-
kW-mo/yr
$2,511 $37,369
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs