ITAC Assessment: MS0325
ITAC logo
ITAC Assessment: MS0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Meat
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 53,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $282,140 3,897,120
kWh
Electricity Demand $53,335 9,877
kW-mo/yr
Electricity Fees $340,507 -
Natural Gas $240,114 23,378
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,408

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,471 $24,719 $17,385
242,981
kWh
$1,798
-
kW-mo/yr
$288 -
02 2.2135: Repair and eliminate steam leaks $9,208 $156 - - - $9,208
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $6,992 $8,100 - - - $6,992
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,031 $7,308 $3,971
55,500
kWh
- $60 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,772 $236 $1,747
24,433
kWh
- $25 -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $411 $1,800 $403
5,615
kWh
- $8 -
07 2.4221: Install compressor air intakes in coolest locations $318 $1,050 $216
3,020
kWh
$97
-
kW-mo/yr
$5 -
TOTAL RECOMMENDED $42,203 $43,369 $23,722
331,549
kWh
$1,895
-
kW-mo/yr
$386 $16,200
-
MMBtu
TOTAL IMPLEMENTED $29,408 $27,725 $18,004
251,616
kWh
$1,895
-
kW-mo/yr
$301 $9,208
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs