| Assessment Year | 2008 |
|---|---|
| Principal Product | Meat |
| NAICS | 311611: Animal (except Poultry) Slaughtering |
| SIC | 2011: Meat Packing Plants |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
53,000
ft2
|
| Annual Production | 7,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $282,140 | 3,897,120 |
kWh
|
$0.072 |
| Electricity Demand | $53,335 | 9,877 |
kW-mo/yr
|
$5.40 |
| Electricity Fees | $340,507 | - |
|
- |
| Natural Gas | $240,114 | 23,378 |
MMBtu
|
$10.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,203 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,408 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,471 | $24,719 |
$17,385
242,981
kWh
|
$1,798
-
kW-mo/yr
|
$288 | - | |
| 02 | 2.2135: Repair and eliminate steam leaks | $9,208 | $156 | - | - | - |
$9,208
-
MMBtu
|
|
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $6,992 | $8,100 | - | - | - |
$6,992
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,031 | $7,308 |
$3,971
55,500
kWh
|
- | $60 | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,772 | $236 |
$1,747
24,433
kWh
|
- | $25 | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $411 | $1,800 |
$403
5,615
kWh
|
- | $8 | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $318 | $1,050 |
$216
3,020
kWh
|
$97
-
kW-mo/yr
|
$5 | - | |
| TOTAL RECOMMENDED | $42,203 | $43,369 |
$23,722
331,549
kWh
|
$1,895
-
kW-mo/yr
|
$386 |
$16,200
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $29,408 | $27,725 |
$18,004
251,616
kWh
|
$1,895
-
kW-mo/yr
|
$301 |
$9,208
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs